Our Coating Systems
We install two industry-leading coating systems — silicone and acrylic — each engineered for specific roof types and performance requirements. Both deliver exceptional protection for Mississippi's demanding climate.
Premium Protection
Silicone coatings are the gold standard for commercial flat and low-slope roofs. With 90%+ solids content, they cure to a seamless, fully-adhered membrane that stands up to ponding water, UV degradation, and Mississippi's intense heat and humidity — without cracking, chalking, or peeling.
90%+
Solids Content
80–88%
Solar Reflectance
200–400%
Elongation
250+ psi
Tensile Strength
Up to 15 years
Warranty
40°F – 120°F
Application Temp
High-Reflectivity System
Acrylic coatings deliver outstanding solar reflectance and breathability, making them ideal for metal roofs, single-ply membranes, and large commercial surfaces. Their water-based formula is environmentally friendly, low-VOC, and cost-effective for high-square-footage applications.
65–70%
Solids Content
82–88%
Solar Reflectance
150–300%
Elongation
200+ psi
Tensile Strength
Up to 15 years
Warranty
50°F – 100°F
Application Temp
Compatibility
Our coating systems are engineered to adhere to virtually every commercial roofing substrate. Not sure if your roof qualifies? We offer free on-site assessments.
Coating vs. Replacement
Coatings are applied directly over your existing roof, eliminating the cost and waste of a full tear-off and disposal.
A coating system typically costs half as much as a full roof replacement — with comparable or better long-term performance.
High-reflectivity coatings reduce rooftop temperatures by up to 50°F, cutting HVAC loads and energy bills from day one.
Unlike patching, a full coating creates a continuous waterproof membrane across the entire roof surface.
Our systems are specifically selected for the Gulf South's extreme UV exposure, humidity, and temperature swings.
Application is non-disruptive. Your facility stays fully operational throughout the entire coating process.
Get a free on-site assessment and written proposal — no obligation.